FAQ’s

FAQs
I've already had mud jacking done on my driveway, can I now get foam lifting?

Absolutely. The Polyurethane foam fills voids under concrete. Any dirt from the mud jacking that has been washed away will then be filled with polyurethane.

What is the environmental impact of Polyurethane?

Polyurethane is non-toxic to the environment, free from BPA’s and has a longer lifespan of individual parts. This is a  better environmentally conscious decision.

What cities do you service?

Acheson, Alberta Beach, Beaumont, Calmar, Devon, Edmonton, Fort Saskatchewan, Leduc, Leduc County, Ma-Me-O Beach, Morinville, Mulhurst, Nisku, Parkland County, Sherwood Park, Spruce Grove, St. Albert, Stoney Plain, Westlock, and Westlock County.

What's the difference between mud jacking and polyurethane injections?

There are many differences between the two. Polyurethane cures in minutes whereas mud jacking cures in a day. Polyurethane weighs 2 lbs per cubic foot and mud jacking weighs 100lbs per cubic foot. Polyurethane injection sites are only 0.25″ and mud jacking is about 1.25″

How does this compare in terms of cost with mud jacking and replacing my driveway?

Polyurethane lifting is only slightly more expensive than mud jacking. While mud jacking needs to be redone every couple of years, polyurethane lifting has a significantly longer lifespan. Polyurethane lifting will save you thousands of dollars by not needing to replace the entire concrete slab.

TCB Foam Solutions Is Committed To Solving The
Problem Your Concrete Has Become.